by Platipus Anchors | Jul 20, 2020
Reynoldswood Drive Drainage Improvements – USA Project Specification The county of Hillsborough improved the outfall from the Reynoldswood subdivision pond through a conveyance system along Ehrlich Road to the tributary of Sweetwater Creek. By constructing a new swale...
by Platipus Anchors | Jul 17, 2020
Cirebon 2 - Indonesia Project Specification The 1000 MW coal power plant, being constructed in the coastal region of northern West Java, Indonesia with poor soil and potential flooded working conditions, posed several challenges for the installation of the various...
by Platipus Anchors | Apr 14, 2020
Mackay's Crossing to Pekapeka, V129 Pipeline - New Zealand Project Specification A 12″ gas pipeline was laid through sandy soils that were prone to a high water table and liquefaction and so a permanent buoyancy control solution was required that could be installed...
by Platipus Anchors | Jul 10, 2017
Gaz De France - Calais, France Project Specification A 14km high pressure gas pipeline needed to be laid through the northern part of Calais. High water levels meant that buoyancy control measures were required to hold the pipeline in position. Conventional methods...
by Platipus Anchors | Jul 10, 2017
Town Center at Haddon Underground Storage System - USA Project Specification In an effort to redevelop the Haddon business district, a mixed-use apartment and retail center was constructed in the urban downtown in the hopes of bringing several hundred residents to an...