STAGE ONE - DRIVING
THE ANCHOR
|
||||||||||
![]() ![]() |
||||||||||
| Drive
the ground anchor system into the ground to the required installation
depth. |
||||||||||
|
STAGE TWO - REMOVING
THE RODS
|
||||||||||
![]() ![]() |
||||||||||
| Remove
the drive rod from the body of the ground anchor, either by hand or using
rod removing equipment. |
||||||||||
|
STAGE THREE - LOADLOCKING
|
||||||||||
![]() ![]() |
||||||||||
| Loadlock the ground anchor system into its working position by applying a load to the wire tendon. | ||||||||||
![]() ![]() |
||||||||||