| The
B8 and B10 ground anchors are normally associated with heavy percussive
installation. In this situation, installation is completed using a wheeled
or tracked excavator with a percussive breaker attachment. Loadlocking
is completed using a hydraulic loadlocking unit.
Where ground
conditions are hard or large quantities of anchors are to be installed,
this type of equipment can also be used to install the B4 and B6 anchors.
|
||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||
| STAGE
ONE - DRIVING THE GROUND ANCHOR |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| Drive
the ground anchor system into the ground to the required installation
depth. |
||||||||||||||||||||
| STAGE
TWO - REMOVING THE RODS |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| Remove the drive rod from the body of the ground anchor, either by hand or using rod removing equipment. | ||||||||||||||||||||
| STAGE
THREE - LOADLOCKING |
||||||||||||||||||||
![]() |
||||||||||||||||||||
| Loadlock the ground anchor system into its working position by applying a load to the wire tendon. | ||||||||||||||||||||
| Platipus
Anchors Limited - UK Office Kingsfield Business Centre, Philanthropic
Road, REDHILL, Surrey, RH1 4DP, England. Tel: +44 (0) 1737 762300 Fax: +44 (0) 1737 773395 Email: info@platipus-anchors.com |
|||
| Platipus
Anchors Inc- USA Office 2008 Garner Station Boulevard, Raleigh, NC 27603,
USA. Tel: 866 PLATIPUS (752 8478) Fax: 919 859 9597 Email: info@platipus-anchors.com |
|||