



|
|||||||||||||||||||||||||||||||||||||||
|
STAGE ONE - DRIVING
THE EARTH ANCHOR
|
||||||||||
![]() ![]() |
||||||||||
| Drive
the earth anchor system into the ground to the required installation depth. |
||||||||||
|
STAGE TWO - REMOVING
THE RODS
|
||||||||||
![]() ![]() |
||||||||||
| Remove
the drive rod from the body of the earth anchor, either by hand or using
rod removing equipment. |
||||||||||
|
STAGE THREE - LOADLOCKING
|
||||||||||
![]() ![]() |
||||||||||
| Loadlock the earth anchor system into its working position by applying a load to the wire tendon. | ||||||||||
![]() ![]() |
||||||||||
| Platipus
Anchors Limited - UK Office Kingsfield Business Centre, Philanthropic
Road, REDHILL, Surrey, RH1 4DP, England. Tel: +44 (0) 1737 762300 Fax: +44 (0) 1737 773395 Email: info@platipus-anchors.com |
|||
| Platipus
Anchors Inc - USA Office 2008 Garner Station Boulevard, Raleigh, NC
27603, USA.
Tel: 866 PLATIPUS (752 8478) Fax: 919 859 9597 Email: info@platipus-anchors.com |
|||