Contractors Guidelines & Considerations

Guideline images.

Things To Remember

Question: How long does it take to install a Rootball Fixing System?
Answer:
Once the hole is dug and the tree is ready to place into it’s pit, it should take approximately 15 - 30 minutes depending upon kit size and soil conditions.

Question: How will the sail area affect my choice of kit?
Answer:
Consideration must be given when the tree is in leaf as extra wind loading may require larger anchorage.

Question: What tools do we need?
Answer:

1. A drive rod (HDR or PDR of suitable size)
2. A tension lever
3. A Plati-Hook (or stressing jack for RF3P/ RF4P)
4. Postrammer, sledgehammer or mechanical Breaker for powered installation

Question: What tools are not available from Platipus?
Answer:

1. Wire cutters/scissors
2. Sledgehammer

Note: Due to settlement of the tree re-tensioning is highly recommended after planting.

Interactive Brochure and Installation Instructions

View Interactive Brochure
View Installation Instructions
View

Tree and Irrigation Enquiries

Want To Find Out More

Enquire

Featured Case Studies

Tech Support