Civil Engineering and Construction - Introduction
Hardman Square, Spinningfield
Client: Allied London
Landscape Architect: Hyland Edgar Driver
Landscape Contractor: English Landscapes Ltd
This prime commercial development located in the city centre of Manchester required landscaping to
create a more natural green environment. Eight large 1m girth oak trees were planted into
preformed concrete containers, each with their own watering system and drainage channel. The
close proximity of the surrounding buildings created a ‘wind tunnel’ effect which meant that the trees
needed to be secured for the first 5 years.
|
Tree Anchor System: RF4RTB - 3 x anchor cables with 3 x expanding eyebolts, 1 x two way ratchet tensioner c/w 10m of 6mm Ø galvanised cable. Plus PM4: 3 x Plat-Mat rootball protection mesh. |
||
|
Quantity: 8 |
Anchor Design Life: 5 yrs |
Soil Type: Prepared Tree Soil |
Featured Case Studies
-
A1 (m) Bramham To Wetherby Upgrade Scheme, Paradise Farm
View Case Study
-
Banks Wood, Dowpits Lane Appleby-in-Westmorland, Cumbria
View Case Study
-
Burgess Hill Embankment Strengthening
View Case Study
-
Power Line Crossing, Glasgow
View Case Study
-
White Lion Close, Summerhill, Wrexham
View Case Study
-
Wickham Market Bridge, Suffolk
View Case Study